Bathroom renovation in Kokapet
Leaking walls, loose tiles or a bathroom that just looks old? We renovate bathrooms across Kokapet with new plumbing, proper waterproofing, modern tiles and fittings — typically in 10–15 days.
Bathroom quote in Kokapet
Share a few details and our designer will call you back within one working day.
Bathrooms in Kokapet
Kokapet's premium high-rises and sky villas call for luxury finishes — veneer panelling, quartz and marble, designer lighting and smart-home ready wiring. Bathrooms are often the first part of these homes to need attention — usually because of seepage into the next room, ageing GI pipes or dated tiles.
Our team handles the complete job: inspection, demolition, plumbing, waterproofing with a 48-hour flood test, tiling, fittings, glass partition, ceiling and lighting. We renovate one bathroom at a time so your family always has a working bathroom.
- Free site inspection & leakage check
- Removal of old tiles, fittings & debris
- New concealed CPVC / UPVC plumbing lines
- Multi-coat waterproofing + 48-hour flood test
- Floor & wall tiles laid with correct drain slope
- Wall-hung or floor-mounted WC, basin & diverter
- Vanity unit, mirror cabinet & accessories
- Toughened glass shower partition
Bathroom renovation cost in Kokapet
Bathroom refresh
New fittings, vanity, partial tiles
Standard renovation
Full strip, waterproofing, tiles, fittings
Premium renovation
Large tiles, wall-hung WC, glass partition
Luxury bathroom
Designer tiles, concealed cistern, rain shower
* Indicative, per standard 5×8 ft bathroom. Exact quote after a free inspection.
Bathroom renovation in Kokapet: FAQs
How much does bathroom renovation cost in Kokapet?
A complete bathroom renovation in Kokapet — demolition, new plumbing, waterproofing, tiles and mid-range fittings — typically starts around ₹1.2 lakh per standard bathroom. A refresh can start near ₹65,000.
Do you repair bathroom leakage in Kokapet?
Yes. We inspect homes in Kokapet and nearby Narsingi, Financial District, Gandipet, find the source of seepage and fix it with new plumbing and waterproofing.
How long does a bathroom renovation take in Kokapet?
Usually 10–15 working days per bathroom, including waterproofing curing and a 48-hour flood test. We follow your society's working hours.
Bathroom renovation in other areas
Planning more than a bathroom? See interior designers in Kokapet.
a better space together
Book a free consultation — we'll visit, measure and share ideas for your space.
